The sidewalk project is becoming the Office project of 2010. It just never seems to end!
My dad came over yesterday after work to help me dig out some more of the sidewalk. We got to the garage and the turned the corner between the lean-to and garage. That's where we literally hit a snag. A HUGE rock, which might be partly acting as a primitive footing for the lean-to, was in our way. The distance between the two buildings is only 3' so I already had to make my sidewalk narrower in this area. Now I have a huge rock sticking out about 6" into that. The lean-to is going to be our main project next summer (if it makes it through the winter!) and I was already planning on pushing it away from the garage another 2 feet or so. Plus we'll be pouring a concrete foundation, so the rocks will be gone. So I decided to just work around the large rock for now, save the bricks that will go there and install them next summer after the lean-to is re-built. I found a LOT of broken china by that rock though.. so I can't wait to see what we find next summer when we excavate for the frost walls!
After my dad left, I decided to work on the sidewalk until R came home from work. That way I'd have more time today to devote to the Kitchen. I got pretty far in that hour and a half! Between that and a couple hours this morning I made it around the corner!! I'm running really low on bricks though. I ended up making the sidewalk about 8" wider than I had originally planned, so we'll have to make another trip to Lowe's for more bricks soon. I'll get pretty close to the end though. I also put sand between the joints almost to where I ended, so we could walk on the sidewalk for most of the way to the garage (it's at a point now where it would be almost impossible to not step on it). I've gotten so many compliments on it so far!! The chimney guys... three neighbors! Everyone thinks it looks great and is shocked when they hear I did it myself!
No comments:
Post a Comment